Highway Department

 

5 Year Transportation Improvement Plan

2026 CONSTRUCTION PROJECTS
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING GRANT/OTHER FUNDING TOTAL PROJECT COST
Highway 103 and Highway 105 Highway Spot Re-grading and In-Slope Widening (50% ROW, Utilities, & Wetlands) $350,000 $0 $350,000
Highway 151 Rehab MC25-03: Full Depth mill, cement treated subgrade, and asphalt surfacing (MRM 16.5 to 21) $4,755,000 $0 $4,755,000
50-237-120 (256th St-0.3 mi W of HWY 121) MC20-13 Bridge Replacement (Single Span Pony Truss) $215,244 $679,700 $894,944
50-149-140 (Hwy 130 -1.25mi W and 0.5 mi S of Crooks) MC24-05 Bridge Replacement (Double T) $239,760 $864,000 $1,103,760
Various 2026 - Culvert Replacements and Drain Tile (Hwy 103) $440,000 $0 $440,000
2026 PAINT Pavement markings $113,000 $22,000 $135,000
2026 Crack Seal Pavement Maintenance/Preservation $250,000 $0 $250,000
2026 Overlay Pavement Maintenance/Preservation $0 $0 $0
2026 Chip Seal Pavement Maintenance/Preservation $0 $0 $0
2026 Micro Pavement Maintenance/Preservation $0 $0 $0
TOTALS: $6,363,004 $1,565,700 $7,928,704
2026 DESIGN Project Funding and Descriptions
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING ANTICIPATED GRANT/OTHER FUNDING TOTAL PROJECT COST
Highway 103 6.0 miles Rural Highway Reconstruction, MRM 00 to 06 $150,000 $0 $150,000
Highway 105 5.0 miles Rural Highway Reconstruction, MRM 09 to 14 $250,000 $0 $250,000
Highway 149 Border Curve Curve Safety Reconstruction, MRM 00 $24,000 $216,000 $240,000
50-330-206
HWY 103 - 2.6 mi S of Valley Springs
Bridge Replacement
POSTING: none SR = 68.7 ADT= 466 1987-
52' Precast Conc Double Tee BIG 35
$9,662 $38,647 $48,309
50-266-175
HWY 140 - 1.4 mi W of Brandon
Bridge Rehab
POSTING: none SR = 79.2 ADT= 9978 1999-
392' Precast Conc Girder BIG 79.2
$42,445 $169,780 $212,225
50-226-020
246th St - 2.2 mi E and 0.3 mi S of Dell Rapids
MC17-14 Bridge Replacement
POSTING: 27/46T SR = 76 ADT=23 1940-40'
Single Span Steel I-Beam BIG 28.02
$110,106 $0 $110,106
Hwy 119 (Six Mile Rd) Corridor Study, MRM 17.5 to 20 $7,000 $0 $7,000
System Wide Pavement Management (PL Funds) $80,000 $73,846 $153,846
TOTALS: $673,213 $498,273 $1,171,486
2027 CONSTRUCTION Project Funding and Descriptions
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING ANTICIPATED GRANT/OTHER FUNDING TOTAL PROJECT COST
Highway 103 and Hwy 105 YR 2 Highway Spot Re-grading and In-Slope Widening
50% ROW, Utilities, & Wetlands
$400,000 $0 $400,000
Highway 103 Rehabilitation Road resurfacing, FDR
MRM 00 to 02
$2,000,000 $0 $2,000,000
Highway 149 Border Curve Curve Safety Reconstruction and ROW, MRM 00 $300,000 $1,800,000 $2,100,000
50-273-090
263rd St-0.3mi E of 481st Ave
MC22-03 Bridge Replacement
POSTING: 29/48T SR = 46 ADT=23
1937-31' Single Span Steel I-Beam Replace with RCBC BIG 35.56
$102,680 $569,519 $672,198
50-196-120
256th St - 2.0 miles north and 0.9 miles west of Renner
Bridge Preservation
POSTING: none SR = 97.4 ADT=24 1975-
212' Three Span Steel Girder BIG 14.8
$266,400 $1,065,600 $1,332,000
50-242-060
HWY 114 - 4.2 mi E of Baltic
Bridge Replacement
POSTING: none SR = 63.1 ADT=757 1956-
54' Three Span Cont Concr BIG 35
$185,617 $742,470 $928,087
TOTALS: $8,332,518 $4,199,589 $12,532,106
2027 DESIGN Project Funding and Descriptions
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING ANTICIPATED GRANT/OTHER FUNDING TOTAL PROJECT COST
Highway 105 DESIGN YR 2 5.0 miles Rural Highway Reconstruction,
MRM 09 to 14
$75,000 $0 $75,000
50-192-132
Mapleton Rd - 1.3 miles west and 0.8 miles north of Renner
Bridge Preservation
POSTING: none SR = 100 ADT=60 1990-
223' Five Span Steel Cont Concr BIG 9.18
$16,000 $64,000 $80,000
50-137-217
266th St-1.5 mi W of Ellis Road BIG 30.56
Bridge Replacement
POSTING: 28/46 T SR = 46 ADT= 74 1952-
32' Single Span Steel I-Beam BIG 30.56
$88,084 $0 $88,084
TOTALS: $606,053 $280,442 $886,495
2028 CONSTRUCTION Project Funding and Descriptions
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING ANTICIPATED GRANT/OTHER FUNDING TOTAL PROJECT COST
Highway 105 Reconstruction Highway Spot Re-grading and In-Slope Widening, MRM 09 to 14 $5,375,000 $0 $5,375,000
50-330-086
HWY 103 -0.14 mi N of Hwy 120
MC22-08 Bridge Replacement
POSTING: none SR = 70 ADT= 247 1977-
52' Single Span Double-T Double T BIG 31.92
$178,743 $714,971 $893,713
50-219-015
HWY 104-0.5 mi E of Dell Rapids
Bridge Replacement
POSTING: none SR=56.2 ADT=833
1938-36.3' 2-span Cont Concr BIG 36
$155,000 $860,441 $1,015,441
TOTALS: $9,621,543 $4,279,434 $13,900,976
2028 DESIGN Project Funding and Descriptions
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING ANTICIPATED GRANT/OTHER FUNDING TOTAL PROJECT COST
Maple/Park St Veterans PKWY to SD11 3.2 miles Rural Highway
NEW Construction Final Design/ROW
$0 $520,000 $520,000
50-330-159
487th Ave - 2.1 mi N of Valley Springs
MC22-05 Bridge Replacement
POSTING: 19/32T SR = 62 ADT=62 1958-
32' Single Span Steel I-Beam BIG 32.78
$88,084 $0 $88,084
50-329-160
260th St - 2 miles N of Valley Springs
Bridge Replacement
POSTING: 25/42T SR = 73 ADT=75 1934-
32' Single Span Steel I-Beam BIG 34.24
$88,084 $0 $88,084
50-189-140
Hwy 130 - 1.6 miles west of Renner
Bridge Preservation
POSTING: none SR = 79.1 ADT=2419 1966 -
324' Four Span Steel Girder BIG 34
$22,000 $88,000 $110,000
2029 CONSTRUCTION Project Funding and Descriptions
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING ANTICIPATED GRANT/OTHER FUNDING TOTAL PROJECT COST
Highway 105 Reconstruction Highway Spot Re-grading and In-Slope Widening, MRM 09 to 14 $5,375,000 $0 $5,375,000
50-330-159
487th Ave - 2.1 mi N of Valley Springs
MC22-05 Bridge Replacement
POSTING: 19/32T SR = 62 ADT=62 1958-
32' Single Span Steel I-Beam BIG 32.78
$136,531 $352,338 $488,869
50-329-160
260th St - 2 miles N of Valley Springs
Bridge Replacement
POSTING: 25/42T SR = 73 ADT=75 1934-
32' Single Span Steel I-Beam BIG 34.24
$136,531 $352,338 $488,869
50-189-140
Hwy 130 - 1.6 miles west of Renner
Bridge Preservation
POSTING: none SR = 79.1 ADT=2419 1966 -
324' Four Span Steel Girder BIG 34
$310,800 $1,243,200 $1,554,000
Maple/Park St Veterans PKWY to SD11 3.2 miles Rural Highway NEW Construction $0 $5,850,000 $5,850,000
2029 PAINT Pavement markings $113,000 $22,000 $135,000
2029 Crack Seal Pavement Maint/Preserv. $250,000 $0 $250,000
2029 Overlay Pavement Maint/Preserv. $3,175,000 $0 $3,175,000
2029 Chip Seal Pavement Maint/Preserv. $675,000 $0 $675,000
2029 Micro Pavement Maint/Preserv. $0 $0 $0
TOTALS: $10,171,862 $7,819,876 $17,991,738
2029 DESIGN Project Funding and Descriptions
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING ANTICIPATED GRANT/OTHER FUNDING TOTAL PROJECT COST
50-135-229
Wayne Ave- 3.4 miles south and 1.5 miles west of Ellis
Bridge Preservation
POSTING: none SR = 74.5 ADT=56 1940-24'
Single Span Steel I-beam BIG 26.56
$36,000 $0 $36,000
50-192-040
HWY 110 - 1.2 miles west and 2.3 miles south of Dell Rapids
Bridge Preservation
POSTING: none SR = 80.2 ADT=324 1964-
264' Three Span Steel Girder BIG 26.96
$85,000 $0 $85,000
50-199-104
Meadowland Street - 4.4 miles south and 0.1 mles west of Baltic
Bridge Preservation
POSTING: 26/44T SR = 69 ADT=26 1948-50'
Two Span Steel I-beam BIG 26
$47,000 $0 $47,000
50-243-100
HWY 122 - 1.0 miles south and 6.7 miles west of Garretson
Bridge Preservation
POSTING: none SR = 99.7 ADT=736 2015-
60.7' Two Span Continuous Concrete BIG 24.82
$45,000 $0 $45,000
TOTALS: $213,000 $0 $213,000
2030 CONSTRUCTION Project Funding and Descriptions
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING ANTICIPATED GRANT/OTHER FUNDING TOTAL PROJECT COST
Hwy 103 Reconstruction Highway Spot Re-grading and In-Slope Widening, MRM 19 to 22 $2,125,000 $0 $2,125,000
50-160-199
HWY 137 - 0.4 mi S and 1.0 mi E of Ellis
Bridge Replacement
POSTING: none SR = 64.5 ADT=1700 1982-
42' Single Span Double T BIG 36
$144,369 $577,476 $721,845
50-330-183
487th Ave-0.3 mi S of 262nd St
Bridge Replacement
POSTING: none SR = 66.6 ADT= 408 1967-
119' 3-span Continuous Concr. BIG 35
$409,046 $1,474,039 $1,883,084
50-137-040
248th St-3.2 mi E of Colton
MC22-10 Bridge Replacement
POSTING: none SR = 49.8 ADT= 1810
1963-128.5' 5-span Continuous Concr. BIG 35
$429,698 $1,637,613 $2,067,310
50-330-206
HWY 103 - 2.6 mi S of Valley Springs
Bridge Replacement
POSTING: none SR = 68.7 ADT= 466 1987-
52' Precast Conc Double Tee BIG 35
$178,743 $714,971 $893,713
2028 PAINT Pavement markings $113,000 $22,000 $135,000
2028 Crack Seal Pavement Maint/Preserv. $250,000 $0 $250,000
2028 Overlay Pavement Maint/Preserv. $0 $0 $0
2028 Chip Seal Pavement Maint/Preserv. $0 $0 $0
2028 Micro Pavement Maint/Preserv. $2,850,000 $0 $2,850,000
TOTALS: $6,499,856 $4,426,099 $10,925,952
2030 DESIGN Project Funding and Descriptions
PROJECT LOCATION PROJECT DESCRIPTION LOCAL FUNDING ANTICIPATED GRANT/OTHER FUNDING TOTAL PROJECT COST
50-100-125
Hwy 149 - 2.5 miles north and 1.0 mile east of Hartford
Bridge Preservation
POSTING: none SR = 91.1 ADT=1554 1967-
106' Three Span Continuous Concrete BIG 28
$62,000 $0 $62,000
50-186-060
Hwy 114 - 1.4 miles west of Baltic
Bridge Preservation
POSTING: none SR = 88.4 ADT=2450 1963-
60.5' Three span Cont Concr BIG 28
$55,000 $0 $55,000
50-239-090
253rd St - 7.1 miles west of Garretson
Bridge Replacement
POSTING: 29/49T SR = 72.9 ADT=62 1937-
32' Single Span Steel I-Beam BIG 23.06
$88,084 $0 $88,084
50-290-149
483rd Ave - 1.1 miles north and 1.0 miles east of Corson
Bridge Replacement
POSTING: none SR = 52.1 ADT=34 1938-
Double 10'x5' Box BIG 12.92
$12,000 $48,000 $60,000
50-324-170
261st St - 1.0 mile north and 0.6 miles east of Valley Springs
Bridge Replacement
POSTING: none SR = 52.7 ADT=74 1935-
23.3' Two Span Steel I-beam BIG 17.24
$64,137 $0 $64,137
TOTALS: $281,221 $48,000 $329,221